Project for the implementation of the construction of a bridge over the Khaleh River in the area of Salman Farsi St.
Construction of Guard Structure, Main Structure, Thin Work, Electrical, Mechanical, and Mid-Tunnel Ventilation Systems for N7-M7 Line 7 of Tehran Metro
Construction, repair, pavement, asphalt coating, and manhole leveling on streets wider than 10 meters in District 1 of Rasht
Preparation and Implementation of Asphalt in Rural Roads of Sadat Mahalleh Hende Khaleh (Upper Hende Khaleh – Keshavarz Street), Sowme’eh Sara County
River Rehabilitation of Zarjoub River (Construction of Protective Wall in Dabaghian Neighborhood, Rasht City)
Preparation and implementation of asphalt paving for the streets of the lower neighborhood of Handeh Khaleh village
Surface Water Collection and Conveyance Operations for Motahari, Shariati, Vishgahi, and Neshat Streets in Rasht City
Implementation of Pipeline and Drip and Sprinkler Irrigation Systems for Green Spaces along Shahid Beheshti Boulevard, Rasht
Participation in the implementation of the Zarjoub bridge level crossing project located in Golsar Rasht