Surface Water Diversion of Moallem Boulevard (Western Side) – Ramsar

Client: Ramsar Municipality

Designer: Hydropejouhan Yekom Consulting Engineers

Project Supervision: Civil Engineering Unit of Ramsar Municipality

Contract number: S-99-4243

Start date: 2020.07.14

End date: 2021.05.15

Location: Mazandaran Province, Ramsar County

Project Specifications and Overall Objective:

The project involves excavation operations to a depth of 5 meters and the installation of 1500 mm diameter reinforced concrete pipes with an approximate weight of 5.5 tons along a length of 800 meters in the western side of Moallem Boulevard. The project also includes the installation of concrete manholes for surface access. The project’s operational volumes include:

  • Earthwork operations, including excavation and backfilling, with a volume of 18,000 cubic meters.
  • Concrete pouring operations, with a volume of 580 cubic meters.
  • Repair and restoration of the excavation strip and asphalt surfacing, with an area of 15,000 square meters.