Pipe laying operations project to collect and direct surface water in Kamalshahr, Karaj

Project Overview

Project Title: Surface Water Collection and Drainage Pipeline Construction – Kamalshahr City

Client: Kamalshahr Municipality

Design and Supervision Consultant: Municipality Civil Engineering Department Mr. Mehdi Sarai

Contract Number: 2660/140

Start Date: 17  ⁄  4  ⁄  2025

Completion Date: 17  ⁄  4  ⁄  2026

Project Location: Alborz Province – Kamalshahr – Shahid Beheshti Street and Bagh Zamani Street

Project Title: Surface Water Collection and Drainage Pipeline Construction – Kamalshahr City
Client: Kamalshahr Municipality

Design and Supervision Consultant: Municipality Civil Engineering Department Mr. Mehdi Sarai

Contract Number: 2660/140

Start Date: 17  ⁄  4  ⁄  2025

Completion Date: 17  ⁄  4  ⁄  2026

Project Location: Alborz Province – Kamalshahr – Shahid Beheshti Street and Bagh Zamani Street

مشـخـصـات و هـدف کلی پـروژه  :

  • طول مسیر لوله‌گذاری: 2,550 متر
  • نوع لوله: لوله بتنی مسلح
  • قطر لوله‌ها: 120 و 140 سانتی‌متر
  • محل اجرا: خیابان شهید بهشتی و خیابان باغ‌زمانی
  • هدف اجرایی: احداث کلکتور اصلی برای جمع‌آوری و هدایت آب‌های سطحی شهری

این پروژه با هدف کنترل و مدیریت روان‌آب‌های سطحی و جلوگیری از آب‌گرفتگی در معابر شهری در کمالشهر اجرا می‌گردد. عملیات اجرایی شامل احداث کلکتور اصلی به طول بیش از 2.5 کیلومتر با لوله‌های بتنی تقویت‌شده، در خیابان‌های شهید بهشتی و باغ‌زمانی می‌باشد که باعث جمع‌آوری، انتقال و هدایت اصولی آب‌های سطحی به مسیرهای خروجی تعیین‌شده خواهد شد.