Construction of Surface Water Diversion Channels in Four Points of Ramsar City
Client: Ramsar Municipality
Designer: Hydropejouhan Yekom Consulting Engineers
Project Supervision: Civil Engineering Unit of Ramsar Municipality
Contract number: S-99-4592-21
Start date: 2020.07.22
End date: 2021.02.18
Location: Mazandaran Province, Ramsar County
Project Specifications and Overall Objective:
The construction of four open concrete channels for surface water diversion, with a total length of 2,200 meters, was carried out in Ramsar County on designated routes at four points in the city, including: Shahid Ghaffari Alley, Ayatollah Motahhari Street – Abrisham Mahalleh, Shahid Montazeri Street, and Shahid Beheshti Street – Oshtorankooh. The project’s operational volumes include the following activities:
- Earthwork operations, including excavation and backfilling, with a volume of 7,000 cubic meters.
- Concrete pouring operations, with a volume of 750 cubic meters.