Client: Nowshahr Municipality
Designer and Project Supervision: Civil Engineering Unit of Nowshahr Municipality
Contract number: S-99-6326
Start date: 2020.09.05
End date: 2021.05.02
Location: Mazandaran Province, Nowshahr County
Project Specifications and Overall Objective:
The construction of a single-span bridge with a width of 8 meters and a length of 10 meters, resulting in a total deck area of 80 square meters. The project involves the following operations:
- Concrete pouring with a volume of 450 cubic meters.
- The amount of rebar used in the project is 35,000 kilograms.
- Earthwork operations, including excavation and backfilling, with a volume of 15,000 cubic meters.
- Formwork operations with an area of 500 square meters.